top of page

DECEMBER 2019

The 14th Street NW Streetscape Project team would like to wish you a Happy Holidays!

 

We appreciate your patience extended throughout the project and we hope you are enjoying some of these improvements:

 

  • Bus islands

  • Benches

  • Bike racks

  • Landscaping improvements

  • Lighting upgrades

  • Crosswalk improvements

  • New permanent signals (N Street, Rhode Island and S Street; Q Street upcoming)

 

We are working to complete the project as safely and quickly as possible;  however, we have experienced some delays due to utilities and neighboring projects. Although the bulk of the work has been completed, we have three intersections where you will still see construction activity. These intersections are:

 

  • 14th and R Street NW – Utility Conflict

  • 14th and T Street NW – Utility conflict

  • 14th and Florida Avenue NW – Developer Conflict

 

We are continuing our coordination efforts with each of these groups and we look forward to delivering a completed new and improved 14th Street corridor in early Spring 2020.

 

In the meantime, we will be completing the final items on our punch list by mid January, weather permitting.

 

Again, we thank you for your patience while we make these improvements and wish you a Happy Holidays!

Sunday, December 22 – Saturday, December 28, 2019: 
Scheduled Activity, Weather Permitting 

(PENDING: There is work currently scheduled for Saturday, December 28th.

Sunday, December 22, 2019

  • No scheduled construction activity.

Monday, December 23 - Saturday, December 28, 2019

  • Backfilling the storm drain at the northwest corner of 14th and T Street NW.

  • Installation of benches and bike racks. 

  • Continued work on light poles and pulling cables. 

  • Installation of permeable paver sidewalk between S and R Street NW.

  • Inlet, manholes and catch basin work.

  • Work at bus island located at 14th and Florida Avenue NW.

  • There was no construction activity from Tuesday, December 24th at noon through Wednesday, December 25th due to the Christmas Holiday.

Sunday, December 15 – Saturday, December 21, 2019: 
Scheduled Activity, Weather Permitting 

(PENDING: There is no work currently scheduled for Saturday, December 21st.

Sunday, December 15, 2019

  • No scheduled construction activity.

Monday, December 16 - Friday, December 20, 2019

  • Water tie-in at 14th and R Street NW (per DC Water's Schedule). Please note: this work is being performed overnight (Wednesday) to minimize the impacts of the water shut-off necessary to complete this activity.

  • Installation of benches and bike racks. 

  • Electrical work at R Street NW.

  • Trench drain work.

  • Inlet, manholes and catch basin work.

  • Landscaping operations. 

  • Installation of conductor traffic cables at 14th and V Street NW.

  • Installation of and pedestrian and traffic signals at 14th and V Street NW.

  • Installation of conductor traffic cables at 14th and N Street NW.

Saturday, December 21, 2019

  • No scheduled construction activity.

SPECIAL NOTICE: 14th St. NW between R St. and S St. NW
The block of 14th St. NW between R St. and S St. NW was temporarily closed on the morning of December 13th due to a utility issue. All lanes were reopened around 11:30am.
Sunday, December 8 – Saturday, December 14, 2019: 
Scheduled Activity, Weather Permitting 

(PENDING: There is no work currently scheduled for Saturday, December 14th.

Sunday, December 8, 2019

  • No scheduled construction activity.

Monday, December 9 - Friday, December 13, 2019

  • Paving from Riggs Street to Street NW.

  • Paving from T Street to U Street NW.

  • Installation of benches and bike racks. 

  • Electrical work at R Street NW.

  • Trench drain work.

  • Landscaping operations. 

  • Installation of conductor traffic cables at 14th and W Street NW.

  • Installation of and pedestrian and traffic signals at 14th and W Street NW.

Saturday, December 14, 2019

  • No scheduled construction activity.

Sunday, December 1 – Saturday, December 7, 2019: 
Scheduled Activity, Weather Permitting 

(PENDING: There is no work currently scheduled for Saturday, December 7th.

Sunday, December 1, 2019

  • No scheduled construction activity.

Monday, December 2 - Friday, December 6, 2019

  • Paving from Riggs Street to Street NW.

  • Paving from T Street to U Street NW.

  • Installation of benches and bike racks. 

  • Electrical work at R Street NW.

  • Trench drain work.

  • Landscaping operations. 

  • Installation of conductor traffic cables at 14th and Florida Avenue NW.

  • Installation of and pedestrian and traffic signals at 14th and Florida Avenue NW.

Saturday, December 7, 2019

  • No scheduled construction activity.

bottom of page