top of page

MAY 2019

Sunday, May 26 – Saturday, June 1, 2019: 
Scheduled Activity, Weather Permitting 

(PENDING: There is no work currently scheduled for Saturday, June 1st.

Sunday, May 26, 2019

  • No scheduled construction activity.

 

Monday, May 27 - Friday, May 31, 2019

  • Installation of 20-ft poles and 100 watt post top and tear drop fixtures on Q Street NW to Florida Avenue NW. This installation will be done in a block by block sequence (east side and west side).

  • Transfers from R Street to Florida Avenue. This installation will be done in a block by block sequence (east side and west side).

  • Installation of electrical conduit and manholes at the intersections of T Street and S Street NW (east and west side).

  • Installation of curb and sidewalk from 14th & U Street toward 14th & Florida Avenue NW.

  • Installation of fire hydrants at S Street NW. 

  • Installation of catch basins at 14th & S Street NW (scheduled to take place on Friday).

  • Installation of streetlight and traffic signal foundations at S Street, T Street and Florida Avenue NW.

  • Reconnecting for water service at T Street to U Street NW (west side).

  • Shutdown of watermain between 14th Street and T Street NW (per DC Water's schedule).

  • Installation of bolt-on UPS systems at traffic control cabinets from N Street to W Street NW.

  • Tree trimming at the southwest corner of Florida Avenue and Rhode Island Avenue NW (scheduled to take place on Wednesday).

  • Installation of traffic control cabinets at S Street, T Street and Florida Avenue NW.

Saturday, June 1, 2019

  • No scheduled construction activity. 

Sunday, May 19 – Saturday, May 25, 2019: 
Scheduled Activity, Weather Permitting 

(PENDING: There is no work currently scheduled for Saturday, May 25th.

Sunday, May 19, 2019

  • No scheduled construction activity.

 

Monday, May 20 - Friday, May 24, 2019

  • Installation of 20-ft poles and 100 watt post top and tear drop fixtures on Q Street NW to Florida Avenue NW. This installation will be done in a block by block sequence (east side and west side).

  • Transfers from R Street to Florida Avenue. This installation will be done in a block by block sequence (east side and west side).

  • Installation of electrical conduit and manholes at the intersections of T Street and S Street NW (east and west side).

  • Installation of curb and sidewalk from 14th & U Street toward 14th & Florida Avenue NW.

  • Installation of fire hydrants at S Street NW. 

  • Installation of streetlight and traffic signal foundations at S Street, T Street and Florida Avenue NW.

  • Installation of catch basins at T Street NW (southwest corners).

  • Reconnecting for water service at T Street to U Street NW (west side).

  • Shutdown of watermain between 14th Street and T Street NW (per DC Water's schedule).

  • Installation of bolt-on UPS systems at traffic control cabinets from N Street to W Street NW.

  • Tree trimming at the southwest corner of Florida Avenue and Rhode Island Avenue NW (scheduled to take place on Monday and Wednesday).

  • Installation of foundations and traffic control cabinets at S Street, T Street and Florida Avenue NW.

Saturday, May 25, 2019

  • No scheduled construction activity due to the Memorial Day holiday weekend.

Sunday, May 12 – Saturday, May 18, 2019: 
Scheduled Activity, Weather Permitting 

(PENDING: There is work currently scheduled for Saturday, May 18th.

Sunday, May 12, 2019

  • No scheduled construction activity.

 

Monday, May 13 - Wednesday, May 15, 2019

  • Installation of 20-ft poles and 100 watt post top and tear drop fixtures on Q Street NW to Florida Avenue NW. This installation will be done in a block by block sequence (east side and west side).

  • Transfers from S Street to Florida Avenue. This installation will be done in a block by block sequence (east side and west side).

  • Installation of electrical conduit and manholes at the intersections of T Street and S Street NW (east and west side).

  • Installation of fire hydrants at W Street, V Street and S Street NW. 

  • Reconnecting for water service at Swann Street to U Street (west side).

  • Installation of foundations and traffic control cabinets at S Street, T Street, U Street and Florida Avenue NW.

  • Installation of the curb and sidewalk at 14th and U Street NW (NW corner).

  • Installation of the TEC foundation and cabinet at the SE corner of U Street NW.

Thursday, May 16, 2019 - Saturday, May 18, 2019

  • All of the above activities with the exception of the installation of TEC foundation and cabinet at the SE corner of U Street NW. Additional work to be completed:  installation of curb and sidewalk from U Street to V Street NW (east side).

Sunday, May 5 – Saturday, May 11, 2019: 
Scheduled Activity, Weather Permitting 

(PENDING: There is work currently scheduled for Saturday, May 11th.

Sunday, May 5, 2019

  • No scheduled construction activity.

 

Monday, May 6 - Wednesday, May 8, 2019

  • Installation of 20-ft poles and 100 watt post top and tear drop fixtures on Q Street NW to Florida Avenue NW. This installation will be done in a block by block sequence (east side and west side).

  • Transfers from S Street to Florida Avenue. This installation will be done in a block by block sequence (east side and west side).

  • Installation of electrical conduit and manholes at the intersections of T Street and S Street NW (east and west side).

  • Installation of fire hydrants at W Street, V Street and S Street NW. 

  • Reconnecting for water service from Swann Street to U Street (west side).

  • Installation of foundations and traffic control cabinets at Q Street, R Street, S Street, T Street, U Street, V Street, W Street and Florida Avenue NW.

  • Installation of Traffic Control cabinets at R Street, S Street, T Street and Florida Avenue NW.

  • Installation of the curb and sidewalk at 14th and U Street NW (NW corner).

  • Installation of three grate vaults between N Street and Rhode Island NW (east side).

  • Installation of the TEC foundation and cabinet at the SE corner of U Street NW.

Thursday, May 9, 2019 - Saturday, May 11, 2019

  • All of the above activities with the exception of the installation of curb and sidewalk at 14th and U Street NW (NW corner) and the installation of three grate vaults between N Street and Rhode Island Avenue NW. Additional work to be completed:  installation of curb and sidewalk from U Street to V Street NW (east side).

bottom of page